- Home
- Departments
- Departments P - Z
- Stormwater
- Stormwater Regulations
Stormwater Regulations
For construction activities disturbing one or more acres of total land, or will disturb less than one acre of land in unincorporated jurisdictions but are part of a larger common plan of development or sale that will ultimately disturb one or more acres, a Storm Water Pollution Prevention Plan (SWPPP) will need to be developed.
Greene County Stormwater Regulations
The NPDES Phase II rule requires construction sites disturbing equal to or greater than one acre and less than five acres to control pollutants in stormwater runoff. Construction activity disturbing less than one acre requires a permit if it is part of a larger common plan of development or sale disturbing a total of one acre or greater, or is individually designated for permit coverage by the NPDES permitting authority.
Ohio Environmental Protection Agency General Stormwater Permit
Permit Application and Supporting Documents
Greene County Stormwater Permit Application (PDF)
EPA Stormwater Pollution Prevention Plan Checklist (PDF)
BMP Maintenance Agreement (PDF)
Preconstruction Meeting and Supporting Documents
Preconstruction Meeting Highlights (PDF)
Construction Site Inspection Checklist (PDF)
SWP3 Inspection Requirements
Once approval of the SWP3 has been granted, construction may commence subject to other required zoning, building, or other applicable permit approvals. A minimum of five (5) days prior to commencing clearing or demolition work, the Greene County Engineer's Office shall be contacted at (937) 562-7500 to insure proper sediment and erosion control practices are in place before work begins.
Sites will be inspected by the Greene County Engineer's Office at a minimum on a monthly basis until the site has been permanently seeded and stabilized.
Training
Greene County Stormwater Inspection Requirements SWPPPTrack (YouTube Link)
Resources
Developing Your Stormwater Prevention Plan (PDF)
ODNR Rainwater and Land Development Manual (PDF)
Stormwater Regulations
Runoff Control Sediment Abatement Resolution effective 3/1981(PDF)
Erosion Prevention and Sediment Control Regulations- Greene County Draft (PDF)
Post- Construction Stormwater Runoff Control Regulations- Greene County Draft (PDF)
Illicit Discharge and Illegal Connection Control Regulations- Greene County Draft (PDF)
Site Construction SWPPP Instructions and Template:
For construction activities disturbing one or more acres of total land, or will disturb less than one acre of land but are part of a larger common plan of development or sale that will ultimately disturb one or more acres, a Storm Water pollution Prevention Plan (SWPPP) will need to be developed.